Metolong water treatment plant

PROJECT DETAILS

  • Employer Millenium Challenge Account
  • Country Lesotho
  • Sector ecology and environment, water purificaton plants
  • Area Maseru
  • Contract value 59,600,000 euro (2017 Annual Report)
  • Finished work in 12 2017
  • Partecipation 100%

PROJECT DESCRIPTION

Design & build contract for the construction of a water treatment plant for the production of drinking water that will be taken from an existing storage through a water pipe with a diameter of 1,5 meters to the water treatment plant with a capacity of 93,4 million litres/day.

PHOTO